Models for capacitated lot-sizing problem with backlogging, setup carryover and crossover

Models for capacitated lot-sizing problem with backlogging, setup carryover and crossover

0.00 Avg rating0 Votes
Article ID: iaor201525327
Volume: 65
Issue: 11
Start Page Number: 1735
End Page Number: 1747
Publication Date: Nov 2014
Journal: Journal of the Operational Research Society
Authors: , ,
Keywords: lot sizing, setup time
Abstract:

Setup operations are significant in some production environments. It is mandatory that their production plans consider some features, as setup state conservation across periods through setup carryover and crossover. The modelling of setup crossover allows more flexible decisions and is essential for problems with long setup times. This paper proposes two models for the capacitated lot‐sizing problem with backlogging and setup carryover and crossover. The first is in line with other models from the literature, whereas the second considers a disaggregated setup variable, which tracks the starting and completion times of the setup operation. This innovative approach permits a more compact formulation. Computational results show that the proposed models have outperformed other state‐of‐the‐art formulation.

Reviews

Required fields are marked *. Your email address will not be published.