Article ID: | iaor201523893 |
Volume: | 30 |
Issue: | 8 |
Start Page Number: | 1301 |
End Page Number: | 1309 |
Publication Date: | Dec 2014 |
Journal: | Quality and Reliability Engineering International |
Authors: | Rajmanya S V, Ghute V B |
Keywords: | statistics: general, simulation |
The control chart based on Downton's estimator (D chart) has recently been introduced in the literature for monitoring the process variability. The D chart is found to be equally efficient to the S chart in terms of detecting shifts in process variability. In this paper, salient features of D chart and the conforming run length chart are combined to produce synthetic D chart. The average run length performance of the synthetic D chart is investigated using simulation study and is compared with the originally proposed D chart and some other procedures proposed in the literature. It is found that it has an improved performance in comparison with the traditional control charts for process variability.