Article ID: | iaor20127964 |
Volume: | 141 |
Issue: | 1 |
Start Page Number: | 127 |
End Page Number: | 136 |
Publication Date: | Jan 2013 |
Journal: | International Journal of Production Economics |
Authors: | Pang King-Wah |
Keywords: | manufacturing industries, production, combinatorial optimization, heuristics: genetic algorithms, heuristics |
Machine scheduling problem has been extensively studied by researchers for many decades in view of its numerous applications on solving practical problems. Due to the complexity of this class of scheduling problems, various approximation solution approaches have been presented in the literature. In this paper, we present a genetic algorithm (GA) based heuristic approach to solve the problem of two machine no‐wait flowshop scheduling problems that the setup time on the machines is class dependent, and the objective is to minimize the maximum lateness of the jobs processed. This class of machine scheduling problems has many practical applications in manufacturing industry, such as metal refinery operations, food processing industry and chemical products production processes, in which no interruption between subsequent processes is allowed and the products can be grouped into families. Extensive computation experiments have been conducted to evaluate the effectiveness of the proposed algorithm. Results show the proposed methodology is suitable to be adopted for the development of an efficient scheduling plan for this class of problems in real life application.