| Article ID: | iaor20123046 |
| Volume: | 73 |
| Issue: | 3 |
| Start Page Number: | 508 |
| End Page Number: | 516 |
| Publication Date: | Mar 2012 |
| Journal: | Automation and Remote Control |
| Authors: | Martynova E, Servakh V |
| Keywords: | investment, programming: mathematical |
Consideration was given to scheduling investment projects with regard for possible use of credits. The net reduced profit was used as the optimization criterion. The problem was studied, a mathematical model constructed, an algorithm to solve it was suggested, and a polynomially solvable case was specified.