Keywords: | economics, networks |
The large‐scale wind power development in China has reached a bottleneck of grid integrating capability. As a result, excess wind electricity has to be rejected in the nighttime low demand hours, when the wind power is ramping up. To compensate for the fluctuation of wind power, new coal‐fired power plants are being constructed along with the big wind projects in the North China grids. This study analyzed why adding coal‐fired generation cannot remove the bottleneck of wind integration by modeling the operating problem of the wind integration. The peak‐load adjusting factor of the regional grid is defined. Building more coal‐fired power plants will not increase the adjusting factor of the current grid. Although it does help to increase the total integrated wind power in the short term, it will add difficulties to the long‐term wind integration. Alternatively, the coordinated resource utilization is then suggested with the discussion of both the effective pumped hydro storage and the potential electric vehicle storage.