Article ID: | iaor20135165 |
Volume: | 16 |
Issue: | 2 |
Start Page Number: | 167 |
End Page Number: | 185 |
Publication Date: | Aug 2013 |
Journal: | International Journal of Logistics Systems and Management |
Authors: | Kamaruddin Shahrul, AbSamat Hasnida, Khoe Poh Guat, Liau Wai Shan, Tan Hsu Fen, Yap Wan Yee |
Keywords: | semiconductor manufacturing, human factors |
Maintenance is an important facet in manufacturing industry to ensure the equipment is constantly running at optimum condition. The aim of this paper is to improve maintenance system by reducing response time, which induces long total breakdown time. Response time can be defined as time once equipment breakdown occurs until it is fixed. It is directly influenced by human factors, as an example, the maintenance personnel that will perform the maintenance activities. This human factor issue is further investigated in terms of the time taken by operator, maintenance technician, maintenance clerk, and maintenance engineer to respond to machine breakdown during corrective maintenance cases. A new maintenance system is developed to improve the current maintenance system by minimising the human response time. The new system is developed in six phases with the use of methods such as chronology for current and improved maintenance system and value stream mapping (VSM) for comparing the response time between the two systems. The system is implemented in a semiconductor company and confirmed the importance of human factor in achieving lowest response time towards effective maintenance system.