Construction project monitoring by means of RAM‐based composite indicators

Construction project monitoring by means of RAM‐based composite indicators

0.00 Avg rating0 Votes
Article ID: iaor20133706
Volume: 64
Issue: 8
Start Page Number: 1291
End Page Number: 1297
Publication Date: Aug 2013
Journal: Journal of the Operational Research Society
Authors:
Keywords: project management, statistics: data envelopment analysis, measurement
Abstract:

This paper aims to assess the performance of a sample of completed building projects in Oregon by employing the range‐adjusted measure, a slack‐based data envelopment analysis (DEA) model. In the first stage of analysis, project efficiency ratings (ie composite indicators) are derived using selected single performance indicators in a no‐output model; whereas in the second stage, censored Tobit regression is employed to model the efficiency ratings. The results indicate that only four out of the 50 sample projects are efficient within the DEA context. Moreover, there is not much evidence for systematic effects of project size on DEA efficiency rating.

Reviews

Required fields are marked *. Your email address will not be published.