A review of methods and algorithms for optimizing construction scheduling

A review of methods and algorithms for optimizing construction scheduling

0.00 Avg rating0 Votes
Article ID: iaor20133701
Volume: 64
Issue: 8
Start Page Number: 1091
End Page Number: 1105
Publication Date: Aug 2013
Journal: Journal of the Operational Research Society
Authors: , , , ,
Keywords: scheduling, heuristics
Abstract:

Optimizing construction project scheduling has received a considerable amount of attention over the past 20 years. As a result, a plethora of methods and algorithms have been developed to address specific scenarios or problems. A review of the methods and algorithms that have been developed to examine the area of construction schedule optimization (CSO) is undertaken. The developed algorithms for solving the CSO problem can be classified into three methods: mathematical, heuristic and metaheuristic. The application of these methods to various scheduling problems is discussed and implications for future research are identified.

Reviews

Required fields are marked *. Your email address will not be published.