Article ID: | iaor20133701 |
Volume: | 64 |
Issue: | 8 |
Start Page Number: | 1091 |
End Page Number: | 1105 |
Publication Date: | Aug 2013 |
Journal: | Journal of the Operational Research Society |
Authors: | Wang X, Irani Z, Teo K L, Love P E D, Zhou J |
Keywords: | scheduling, heuristics |
Optimizing construction project scheduling has received a considerable amount of attention over the past 20 years. As a result, a plethora of methods and algorithms have been developed to address specific scenarios or problems. A review of the methods and algorithms that have been developed to examine the area of construction schedule optimization (CSO) is undertaken. The developed algorithms for solving the CSO problem can be classified into three methods: mathematical, heuristic and metaheuristic. The application of these methods to various scheduling problems is discussed and implications for future research are identified.