Flow shop scheduling with peak power consumption constraints

Flow shop scheduling with peak power consumption constraints

0.00 Avg rating0 Votes
Article ID: iaor20133932
Volume: 206
Issue: 1
Start Page Number: 115
End Page Number: 145
Publication Date: Jul 2013
Journal: Annals of Operations Research
Authors: , , ,
Keywords: scheduling, programming: multiple criteria
Abstract:

We study scheduling as a means to address the increasing energy concerns in manufacturing enterprises. In particular, we consider a flow shop scheduling problem with a restriction on peak power consumption, in addition to the traditional time‐based objectives. We investigate both mathematical programming and combinatorial approaches to this scheduling problem, and test our approaches with instances arising from the manufacturing of cast iron plates.