| Article ID: | iaor20126785 |
| Volume: | 63 |
| Issue: | 4 |
| Start Page Number: | 1227 |
| End Page Number: | 1234 |
| Publication Date: | Dec 2012 |
| Journal: | Computers & Industrial Engineering |
| Authors: | Chen Yen-Luan |
| Keywords: | optimization, scheduling |
This article studies an optimal imperfect preventive maintenance policy based on a cumulative damage model for a used system with initial variable damage. The used system is subject to shocks occurring to a non‐homogeneous Poisson process, and suffers one of two types of shocks with stochastic probability: type‐I shock (minor) yields a random amount of additive damage of the system, or type‐II shock (catastrophic) causes the system to fail. A bivariate preventive maintenance schedule (