Article ID: | iaor20126755 |
Volume: | 63 |
Issue: | 4 |
Start Page Number: | 1003 |
End Page Number: | 1012 |
Publication Date: | Dec 2012 |
Journal: | Computers & Industrial Engineering |
Authors: | Carlo Hctor J, Giraldo Germn E |
Keywords: | heuristics |
Determining the optimal storage assignment for loads in a unit‐load warehouse has been extensively addressed in the facility logistics literature. However, the process of implementing a particular storage assignment given the current assignment of loads has not received much attention. Typically, unit‐load warehouses use downtime or overtime to remove loads from their current location and move them to the suggested location. This study presents