| Article ID: | iaor20126733 |
| Volume: | 63 |
| Issue: | 4 |
| Start Page Number: | 802 |
| End Page Number: | 812 |
| Publication Date: | Dec 2012 |
| Journal: | Computers & Industrial Engineering |
| Authors: | Velasco Nubia, Barrera David, Amaya CiroAlberto |
| Keywords: | timetabling, scheduling, heuristics, programming: integer |
This paper introduces the multi‐activity combined timetabling and crew scheduling problem. The goal of this problem is to schedule the minimum number of workers required in order to successfully visit a set of customers characterized by services needed matched against schedule availability. Two solution strategies are proposed. The first is based on mathematical programming whilst the second uses a heuristic procedure in order to reduce computational time. The proposed model combines