Electric utility resource planning using Continuous‐Discrete Modular Simulation and Optimization (CoDiMoSO)

Electric utility resource planning using Continuous‐Discrete Modular Simulation and Optimization (CoDiMoSO)

0.00 Avg rating0 Votes
Article ID: iaor20125784
Volume: 63
Issue: 3
Start Page Number: 671
End Page Number: 694
Publication Date: Nov 2012
Journal: Computers & Industrial Engineering
Authors: , , ,
Keywords: planning, simulation: applications
Abstract:

Electric utility resource planning traditionally focuses on conventional energy supplies such as coal, natural gas, and oil. Nowadays, planning of renewable energy generation as well as its side necessity of storage capacities have become equally important due to the increasing growth in energy demand, insufficiency of natural resources, and newly established policies for low carbon footprint. In this study, we propose to develop a comprehensive simulation based decision making framework to determine the best possible combination of resource investments for electric power generation and storage capacities. The proposed tool involves a combined continuous‐discrete modular modeling approach for processes of different nature that exist within this complex system, and will help the utility companies conduct resource planning via employed multiobjective optimization techniques in a realistic simulation environment. The distributed power system considered here has four major components including (1) energy generation via a solar farm, a wind farm, and a fossil fuel power station, (2) storage via compressed air energy storage system, and batteries, (3) transmission via a bus and two main substations, and (4) demand of industrial, commercial, residential and transportation sectors. The proposed approach has been successfully demonstrated for the electric utility resource planning at a scale of the state of Florida.

Reviews

Required fields are marked *. Your email address will not be published.