Article ID: | iaor20125749 |
Volume: | 63 |
Issue: | 3 |
Start Page Number: | 553 |
End Page Number: | 563 |
Publication Date: | Nov 2012 |
Journal: | Computers & Industrial Engineering |
Authors: | Ke Hua, Tian Guangdong, Liu Yumei, Chu Jiangwei |
Keywords: | planning, programming: probabilistic |
Disassembly is not only a premise of products recycling, but also an important link of products remanufacturing. However, used products suffer from the influence of a variety of uncertainties. The randomness of disassembly process is a significant feature. In this paper, a disassembly network is established, in which lengths of arc are stochastic variables with a specified power subject to specified distributions and denote removal times of parts, the energy evaluation method integrating two or more uncertain variables is proposed. According to different disassembly decision‐making criteria, three types of typical stochastic programming models of a disassembly process are developed, namely the minimum expected value model, the maximum energy disassemblability degree model and