| Article ID: | iaor2013862 |
| Volume: | 226 |
| Issue: | 3 |
| Start Page Number: | 500 |
| End Page Number: | 506 |
| Publication Date: | May 2013 |
| Journal: | European Journal of Operational Research |
| Authors: | Zhang Yuan Lin, Wang Guan Jun |
| Keywords: | simulation: applications |
In this paper, the optimal replacement problem is investigated for a system with two types of failures. One type of failure is repairable, which is conducted by a repairman when it occurs, and the other is unrepairable, which leads to a replacement of the system at once. The repair of the system is not ‘as good as new’. The consecutive operating times of the system after repair form a decreasing geometric process, while the repair times after failure are assumed to be independent and identically distributed. Replacement policy