Performance of t control charts in short runs with unknown shift sizes

Performance of t control charts in short runs with unknown shift sizes

0.00 Avg rating0 Votes
Article ID: iaor2013363
Volume: 64
Issue: 1
Start Page Number: 56
End Page Number: 68
Publication Date: Jan 2013
Journal: Computers & Industrial Engineering
Authors: , , ,
Keywords: control charts
Abstract:

Recently, control charts plotting a statistic having a Student’s t distribution have been proposed as an efficient solution to perform Statistical Process Control (SPC) in short production runs where the shift size of the in‐control process mean from µ 0 to µ 1 is known a priori. The shift size is usually measured as a multiple d of the in‐control process standard deviation s 0: but in practice, at the beginning of the production run, both the value of next shift d and s 0 are unknown. As a consequence, when the actual shift size differs from the value assumed at the chart design stage, the performance of the control chart can be seriously affected. To overcome this problem, this paper investigates the statistical performance of the Shewhart, EWMA and CUSUM t charts for short production runs when the shift size is unknown and modeled by means of a statistical distribution. An extensive numerical analysis allows the properties of the three charts to be compared and discussed when uniform and triangular distributions are used by quality practitioners to fit the unknown shift size. An illustrative example is utilized to demonstrate a practical implementation of the best performing among the three investigated charts.

Reviews

Required fields are marked *. Your email address will not be published.