A control scheme integrating the T chart and TCUSUM chart

A control scheme integrating the T chart and TCUSUM chart

0.00 Avg rating0 Votes
Article ID: iaor201112617
Volume: 27
Issue: 4
Start Page Number: 529
End Page Number: 539
Publication Date: Jun 2011
Journal: Quality and Reliability Engineering International
Authors: , ,
Keywords: control charts
Abstract:

This article proposes an integrated scheme (T&TCUSUM chart) which combines a Shewhart T chart and a TCUSUM chart (a CUSUM-type T chart) to monitor the time interval T between the occurrences of an event or the time between events. The performance studies show that the T&TCUSUM chart can effectively improve the overall performance over the entire T shift range. On average, it is more effective than the T chart by 26.66% and the TCUSUM chart by 14.12%. Moreover, the T&TCUSUM chart performs more consistently than other charts for the detection of either small or large T shifts, because it has the strength of both the T chart (more sensitive to large shifts) and the TCUSUM chart (more sensitive to small shifts). The implementation of the new chart is almost as easy as the operation of a TCUSUM chart.

Reviews

Required fields are marked *. Your email address will not be published.