Flexible build‐operate‐transfer contracts for road franchising under demand uncertainty

Flexible build‐operate‐transfer contracts for road franchising under demand uncertainty

0.00 Avg rating0 Votes
Article ID: iaor20127863
Volume: 46
Issue: 10
Start Page Number: 1419
End Page Number: 1439
Publication Date: Dec 2012
Journal: Transportation Research Part B
Authors: ,
Keywords: demand, optimization
Abstract:

As highway franchising programs are being introduced worldwide through the so‐called build‐operate‐transfer (BOT) contracts, both the government and the private investor are facing a critical issue of how to make a BOT contract under the uncertainty of future traffic demand using the new highway. This paper investigates the full and partial flexibility of the BOT contract according to the instruments adopted by the government and the private investor. Full flexibility refers to the case in which the government promises an exogenous rate of return on the private investment and in turn can freely ex post adjust the contract in a socially optimal manner according to the observed demand curve. Partial flexibility refers to the case in which the government and the private investor agree on an ex ante demand risk allocation by contract and the ex post contract adjustment can be made contingent on a Pareto‐improvement to both parties. A preferred Pareto‐improvement can be selected from the Pareto‐optimal solution set of a bi‐objective programming problem equipped with a rational preference. The optimal BOT contracts with the two types of flexibility are examined by assuming that the government chooses the original contract variables to maximize the expected total social welfare under demand uncertainty while taking account of the ex post optimal contract adjustments.

Reviews

Required fields are marked *. Your email address will not be published.