Models for MMSP‐W considering workstation dependencies: A case study of Nissan’s Barcelona plant

Models for MMSP‐W considering workstation dependencies: A case study of Nissan’s Barcelona plant

0.00 Avg rating0 Votes
Article ID: iaor20125945
Volume: 223
Issue: 3
Start Page Number: 669
End Page Number: 679
Publication Date: Dec 2012
Journal: European Journal of Operational Research
Authors: , ,
Keywords: manufacturing industries
Abstract:

In this article, we present two formulations and their unification for the Mixed‐Model Sequencing Problem with Workload Minimisation (MMSP‐W) for production lines with serial workstations and parallel homogeneous processors. The models were executed in Solver CPLEX, with reference instances and with a case study of Nissan’s Powertrain plant in Barcelona. Different situations were analysed to evaluate investments in projects designed to improve process and product design and reduce work overloads in the line at short‐, intermediate‐ and long‐term intervals.

Reviews

Required fields are marked *. Your email address will not be published.