Analysis on multi‐stage lot streaming: The effect of transfer

Analysis on multi‐stage lot streaming: The effect of transfer

0.00 Avg rating0 Votes
Article ID: iaor20122909
Volume: 62
Issue: 4
Start Page Number: 1046
End Page Number: 1054
Publication Date: May 2012
Journal: Computers & Industrial Engineering
Authors:
Keywords: production: JIT, combinatorial optimization, supply & supply chains
Abstract:

Shortening manufacturing lead time and then gaining time‐based competitive advantages are the goals that many more manufacturing companies want to gain. Lot streaming is one of the important methodologies that can be applied by many companies to gain such advantages. In this paper, we focus on the effects of different types of transfer (i.e., preceding‐operator‐based, successive‐operator‐based, and non‐operator‐based) between each pair of stages on the optimal number of transfer batches. With regard to those types of transfer, there are 2×4×2 problems to be analyzed. To simplify the analysis, we refine the problems to three dominating cases. For each dominating problem, the properties of the objective function (i.e., the makespan) are derived, and the optimal number of transfer batches is determined accordingly. The numerical study illustrates the developed results, and moreover, provides two other important findings.

Reviews

Required fields are marked *. Your email address will not be published.