Article ID: | iaor20122414 |
Volume: | 220 |
Issue: | 1 |
Start Page Number: | 210 |
End Page Number: | 224 |
Publication Date: | Jul 2012 |
Journal: | European Journal of Operational Research |
Authors: | Sier David, Singh Gaurav, Welgama Palitha, Ernst Andreas T, Gavriliouk Olena, Oyston Rob, Giles Tracey |
Keywords: | programming: integer, combinatorial optimization, networks, supply & supply chains |
The Hunter Valley Coal Chain is the largest coal export operation in the world with a throughput in excess of 100 million tonnes per annum (Mtpa). Coal is delivered to the shipping terminal from 40 mines using 27 coal load points spread across the Hunter Valley region. This paper describes an MILP model for determining the capacity requirements, and the most cost effective capacity improvement initiatives, to meet demand while minimising the total cost of infrastructure and demurrage. We present results from computational experiments on the model’s performance along with a comparison of the model’s output with detailed analyses by the coal chain analysts and planners.