Applying multi‐start simulated annealing to schedule a flowline manufacturing cell with sequence dependent family setup times

Applying multi‐start simulated annealing to schedule a flowline manufacturing cell with sequence dependent family setup times

0.00 Avg rating0 Votes
Article ID: iaor20113114
Volume: 130
Issue: 2
Start Page Number: 246
End Page Number: 254
Publication Date: Apr 2011
Journal: International Journal of Production Economics
Authors: , , ,
Keywords: optimization: simulated annealing
Abstract:

Meta‐heuristics that attempt to obtain (near) global optimal solutions of NP‐hard combinatorial optimization problems generally require diversification to escape from local optimality. One way to achieve diversification is to utilize the multi‐start hill climbing strategy. By combining the respective advantages of the multi‐start hill climbing strategy and simulated annealing (SA), an effective multi‐start simulated annealing (MSA) heuristic is proposed to minimize the makespan for a flowline manufacturing cell scheduling problem with sequence dependent family setup times. The heuristic performance is evaluated by comparing the results achieved by the proposed heuristic with those achieved by the existing meta‐heuristics. The computational results show that following multi‐start refinement the proposed MSA heuristic is more effective compared to the state‐of the‐art meta‐heuristics on the same benchmark instances.