Group scheduling and due date assignment on a single machine

Group scheduling and due date assignment on a single machine

0.00 Avg rating0 Votes
Article ID: iaor20113076
Volume: 130
Issue: 2
Start Page Number: 230
End Page Number: 235
Publication Date: Apr 2011
Journal: International Journal of Production Economics
Authors: , ,
Keywords: group technology, job shop
Abstract:

We consider a single‐machine scheduling problem involving both the due date assignment and job scheduling under a group technology environment. The jobs (orders) of customers are classified into groups according to their production similarities in advance. To achieve production efficiency and save time/money resource, all jobs of the same group are required to be processed contiguously on the machine. A sequence‐independent setup time precedes the processing of each group. The due dates are assignable according to one of the following three due date assignment methods: FML‐CON, FML‐SLK and DIF, where FML‐CON means that all jobs within the same group are assigned a common due date, FML‐SLK means that all jobs within the same group are assigned an equal flow allowance, and DIF means that each job can be assigned a different due date with no restrictions. The goal is to determine an optimal combination of the due date assignment strategy and job schedule so as to minimize an objective function that includes earliness, tardiness, due date assignment and flow time costs. An O ( n log n ) equ1 time unified optimization algorithm is provided for all of the above three due date assignment methods.

Reviews

Required fields are marked *. Your email address will not be published.