Article ID: | iaor201110800 |
Volume: | 19 |
Issue: | 4 |
Start Page Number: | 533 |
End Page Number: | 545 |
Publication Date: | Dec 2011 |
Journal: | Central European Journal of Operations Research |
Authors: | Pearn L, Su H, Weng W, Hsu H |
Keywords: | combinatorial optimization, scheduling |
This paper considers a two‐stage production system with imperfect processes. Shortages are allowed, and the unsatisfied demand is completely backlogged. In addition, the capital investment in process quality improvement is adopted. Under these assumptions, we first formulate the proposed problem as a cost minimization model where the production run time and process quality are decision variables. Then we develop the criterion for judging whether the optimal solution not only exists but also is unique. If the criterion is not satisfied, the production system should not be opened. An algorithm for the computations of the optimal solutions is also provided. Finally, a numerical example and sensitivity analysis are carried out to illustrate the model.