Article ID: | iaor1992956 |
Country: | Netherlands |
Volume: | 23 |
Issue: | 1/3 |
Start Page Number: | 59 |
End Page Number: | 67 |
Publication Date: | Oct 1991 |
Journal: | International Journal of Production Economics |
Authors: | Dellaert Nico P. |
Keywords: | production |
This paper considers a scheduling problem in a stochastic single-product situation with production to order. For this situation it considers a general rule with small overall costs, by finding the best combination of rules for due-date setting to arriving jobs and production planning, or in other words: a rule leading to acceptable due-dates for most of the clients, with limited costs for storage and penalties, as a result of deviations from the due-dates, and with limited set-up costs.