Coordinated multistage scheduling of parallel batch-processing machines under multiresource constraints

Coordinated multistage scheduling of parallel batch-processing machines under multiresource constraints

0.00 Avg rating0 Votes
Article ID: iaor20105591
Volume: 58
Issue: 4-Part-1
Start Page Number: 933
End Page Number: 947
Publication Date: Jul 2010
Journal: Operations Research
Authors: ,
Abstract:

Motivated by scheduling challenges of burn-in ovens in back-end semiconductor manufacturing, we propose a linear-programming-based algorithm, an integer-programming-based algorithm, and a heuristic-based algorithm to schedule nonhomogenous parallel batch machines with nonidentical job sizes and incompatible job families. We consider the common scheduling of consecutive steps that are linked together through secondary scarce resources. Our approach addresses the availability and compatibility of several resources required to make each process possible. The algorithms strive to meet short-term production targets expressed by product and step. The algorithms are shown to be effective and computationally efficient for this purpose. Taken together with previously developed methodology for the practical translation of target output schedules into short-term local production targets, this article suggests how a complex supply chain manufacturing system can be efficiently and effectively managed by decentralized local scheduling algorithms striving to meet short-term production targets that in turn ensure maintenance of an appropriate dynamic profile across production steps for work-in-process.

Reviews

Required fields are marked *. Your email address will not be published.