Article ID: | iaor20103841 |
Volume: | 94 |
Issue: | 1 |
Start Page Number: | 111 |
End Page Number: | 124 |
Publication Date: | Jan 2009 |
Journal: | Reliability Engineering and System Safety |
Authors: | Wang J, Jones B, Jenkinson I |
Keywords: | inspection |
This paper has been written to give a methodology of applying delay-time analysis to a maintenance and inspection department. The aim is to reduce downtime of plant items and/or reducing maintenance and inspection costs, taking into account the possible environmental impact of a failure in terms of cost, both to the company and the environment. The paper also attempts to give a subjective measure of the consequences of such a failure in terms of cost to the environment, in monetary value to the company and the damaging effect to the company image.