Article ID: | iaor20102888 |
Volume: | 36 |
Issue: | 5 |
Start Page Number: | 561 |
End Page Number: | 564 |
Publication Date: | Sep 2008 |
Journal: | Operations Research Letters |
Authors: | Castro I T, Sanjun E L |
This work considers a combined maintenance strategy in which the repair of the system failures is performed only in an interval of time of the working period. The objective of this paper is to find the optimal interval in which the repairs can be performed.