| Article ID: | iaor20101336 |
| Volume: | 124 |
| Issue: | 1 |
| Start Page Number: | 40 |
| End Page Number: | 50 |
| Publication Date: | Mar 2010 |
| Journal: | International Journal of Production Economics |
| Authors: | Zhang Shu, Ekiolu Sandra Duni, Wen Charlie, Greenwood Allen |
| Keywords: | scheduling, transportation: water, programming: integer |
This paper describes exact and heuristic approaches for scheduling multiple cranes that service a shipyard that produces multiple ships concurrently. Cranes transport a variety of materials over a shared network of tracks; therefore, inter-crane interference is a major factor affecting makespan and crane utilization. The exact approach models the problem as a multi-commodity flow problem with side constraints on a network. The corresponding integer programming formulation is solved using CPLEX. The heuristics proposed decompose the problem in two sub-problems: a scheduling problem that determines the order in which jobs should be performed, and an assignment problem that assigns cranes to jobs. Computational results show that using the Priority/ACO (ant colony optimization) heuristic gives high quality solutions.