A maintenance model for manufacturing lead time in a production system with BMAP input and bilevel setup control

A maintenance model for manufacturing lead time in a production system with BMAP input and bilevel setup control

0.00 Avg rating0 Votes
Article ID: iaor200962767
Country: Singapore
Volume: 25
Issue: 6
Start Page Number: 807
End Page Number: 825
Publication Date: Dec 2008
Journal: Asia-Pacific Journal of Operational Research
Authors: ,
Keywords: production
Abstract:

In this paper, the manufacturing lead time in a production system with maintenance period, non-renewal BMAP (Batch Markovian Arrival process) input and bilevel threshold control is analyzed. The factorization principle is used to derive the distribution of the manufacturing lead time and the mean value. A numerical example is provided to see the effect of the non-renewal input on the system performance.