| Article ID: | iaor20091239 |
| Country: | India |
| Volume: | 29 |
| Issue: | 3 |
| Start Page Number: | 401 |
| End Page Number: | 405 |
| Publication Date: | May 2008 |
| Journal: | Journal of Information & Optimization Sciences |
| Authors: | Tseng Yuan-Jye, Shih Chen-Lin |
| Keywords: | supply & supply chains |
This paper introduces techniques of dynamic methods to confer the variations of turn around time of parts reliability during its proceeding period in a Supply Chain Management multi-site collaboration system, that affects the multi-echelon collaboration plants supply system. This research also considers supply policy to construct the multi-echelon system dynamic simulation model of supply system, and the simulation results which probes into the variations of each supply spare inventory and mission capabilities; optimal operation sequence with minimum total cost is derived using break-even point analysis.