Article ID: | iaor20091027 |
Country: | Netherlands |
Volume: | 161 |
Issue: | 1 |
Start Page Number: | 123 |
End Page Number: | 127 |
Publication Date: | Jul 2008 |
Journal: | Annals of Operations Research |
Authors: | Leachman Robert C., Jula Payman |
Keywords: | production, scheduling |
Motivated by scheduling challenges in back-end semiconductor manufacturing, we propose a framework to oversee and integrate local decentralized scheduling algorithms utilized in complex supply chain manufacturing networks. We fill the gap between higher-level production planning and lower-level scheduling by establishing short-term production targets and priority scores for each product at each step in the system. Given a target output schedule, target cycle times for each step, the process and product structure, and initial WIP status, short-term production targets for each product/step are set. These targets can be used to evaluate the system performance and guide decentralized schedulers to control the system so as to achieve desirable outputs in dynamic environments.