Article ID: | iaor2009510 |
Country: | Serbia |
Volume: | 17 |
Issue: | 2 |
Start Page Number: | 245 |
End Page Number: | 256 |
Publication Date: | Jul 2007 |
Journal: | Yugoslav Journal of Operations Research |
Authors: | Markovic Milan, Ivic Milo |
Keywords: | vehicle routing & scheduling |
This paper examines a problem of forming the pick-up trains by conventional methods (the Futhner method and Special method), aiming at establishing basic characteristics of track facilities and values of shunting operations indicators important for evaluation of the effects of these methods application. The problem under consideration has so far not been examined in the literature to a sufficient extent, although in practice it has been proved to be necessary. For this reason, in this work a simulation study has been undertaken.