Authors: | Mladenovic Sneana |
Keywords: | scheduling, programming: constraints, heuristics |
Starting from the defined network topology and the timetable assigned beforehand, the paper considers a train rescheduling in respond to disturbances that have occurred. Assuming that the train trips are jobs, which require the elements of infrastructure – resources, it was done by the mapping of the initial problem into a special case of job shop scheduling problem. In order to solve the given problem, a constraint programming approach has been used.