Optimization of the Austrian electricity sector (control zone of VERBUND APG) by nodal pricing

Optimization of the Austrian electricity sector (control zone of VERBUND APG) by nodal pricing

0.00 Avg rating0 Votes
Article ID: iaor2009405
Country: Germany
Volume: 13
Issue: 2
Start Page Number: 105
End Page Number: 125
Publication Date: Jun 2005
Journal: Central European Journal of Operations Research
Authors: ,
Keywords: Austria, electricity
Abstract:

The liberalization of the electricity market split the previously vertically integrated and state-regulated companies into three different companies: production, transmission and distribution. This in turn exposed the companies to competitive conditions (especially so for the production branch). This new economic order made some of the established tools for optimized operation of the whole system obsolete, as the newly independent companies now pursued their own specific goals. This paper introduces an optimization model for the Austrian electricity market which meets the requirements of the new economic situation in the electricity branch and maintains the context for optimizing the whole system.

Reviews

Required fields are marked *. Your email address will not be published.