Optimal scheduling of continuous production with constrained schedule structure

Optimal scheduling of continuous production with constrained schedule structure

0.00 Avg rating0 Votes
Article ID: iaor2009230
Country: Germany
Volume: 69
Issue: 1
Start Page Number: 158
End Page Number: 165
Publication Date: Jan 2008
Journal: Automation and Remote Control
Authors:
Keywords: programming: integer
Abstract:

The problem of optimal multi-period production scheduling for continuous-discrete production was formulated as that of mixed-integer programming with a special structure of the constraints on the discrete variables. As was shown, this form of taking into consideration the a priori requirements on the schedule enables reduction in the number of possible variants of values of the discrete variables and, thus, simplification of the problem. The results obtained were verified by way of a plant model.

Reviews

Required fields are marked *. Your email address will not be published.