A fresh approach to performance evaluation in a multi-item production scenario

A fresh approach to performance evaluation in a multi-item production scenario

0.00 Avg rating0 Votes
Article ID: iaor20084333
Country: Netherlands
Volume: 178
Issue: 2
Start Page Number: 627
End Page Number: 630
Publication Date: Apr 2007
Journal: European Journal of Operational Research
Authors:
Keywords: production
Abstract:

In a truly flexible production environment, it is feasible to interchange the production rate of two items, as long as this does not affect the constraint imposed on total manufacturing time. Performance evaluation in a multi-item production scenario has many facets, and its improvement is possible in many ways. After adopting certain benchmarking or analytical process, usually a facility runs at certain performance level with respect to total system cost. It may be a unique approach to explore the possibility of interchanging the production rate of any item with that of another appropriate item in the group. This is discussed in the present paper with the objective of further improvement in the total cost.

Reviews

Required fields are marked *. Your email address will not be published.