Article ID: | iaor20083649 |
Country: | United States |
Volume: | 27 |
Issue: | 3 |
Start Page Number: | 541 |
End Page Number: | 568 |
Publication Date: | Jun 1996 |
Journal: | Decision Sciences |
Authors: | Easton Fred F., Rossin Donald F. |
Keywords: | programming: goal |
Deterministic goal programs for employee scheduling decisions attempt to minimize expected operating costs by assigning the ideal number of employees to each feasible schedule. For each period in the planning horizon, managers must first determine the amount of labor that should be scheduled for duty. These requirements are often established with marginal analysis techniques, which use estimates for incremental labor costs and shortage expenses. Typically, each period in the planning horizon is evaluated as an independent epoch. An implicit assumption is that individual employees can be assigned to schedules with as little as a single period of work. If this assumption violates local work rules, the labor requirements parameters for the deterministic goal program may be suboptimal. As we show in this research, this well-known limitation can lead to costly staffing and scheduling errors. We propose an employee scheduling model that overcomes this limitation by integrating the labor requirements and scheduling decisions. Instead of a single, externally determined staffing goal for each period, the model uses a probability distribution for the quantity of labor required. The model is free to choose an appropriate staffing level for each period, eliminating the need for a separate goal-setting procedure. In most cases this results in better, less costly decisions. In addition, the proposed model easily accommodates both linear and nonlinear under- and overstaffing penalties. We use simple examples to demonstrate many of these advantages and to illustrate the key techniques necessary to implement our model. We also assess its performance in a study of more than 1,700 simulated stochastic employee scheduling problems.