Article ID: | iaor20082369 |
Country: | India |
Volume: | 28 |
Issue: | 2 |
Start Page Number: | 247 |
End Page Number: | 253 |
Publication Date: | Mar 2007 |
Journal: | Journal of Information & Optimization Sciences |
Authors: | Lin Yi-Chen |
Keywords: | programming: mathematical |
In this paper we developed a mathematical programming model for multiple integrated MRP production stages. This model simultaneously solves the master production scheduling, material requirements planning, production scheduling and capacity planning problems, each of which is handled individually in MRP system.