A mathematical programming model for multiple integrated MRP planning stages

A mathematical programming model for multiple integrated MRP planning stages

0.00 Avg rating0 Votes
Article ID: iaor20082369
Country: India
Volume: 28
Issue: 2
Start Page Number: 247
End Page Number: 253
Publication Date: Mar 2007
Journal: Journal of Information & Optimization Sciences
Authors:
Keywords: programming: mathematical
Abstract:

In this paper we developed a mathematical programming model for multiple integrated MRP production stages. This model simultaneously solves the master production scheduling, material requirements planning, production scheduling and capacity planning problems, each of which is handled individually in MRP system.

Reviews

Required fields are marked *. Your email address will not be published.