Article ID: | iaor20082354 |
Country: | United States |
Volume: | 54 |
Issue: | 6 |
Start Page Number: | 602 |
End Page Number: | 614 |
Publication Date: | Sep 2007 |
Journal: | Naval Research Logistics |
Authors: | Kuo Yarlin, Chang Zi-Ann |
Keywords: | maintenance, repair & replacement, programming: dynamic |
This paper finds the optimal integrated production schedule and preventive maintenance plan for a single machine exposed under a cumulative damage process, and investigates how the optimal preventive maintenance plan interacts with the optimal production schedule. The goal is to minimize the total tardiness. The optimal policy possesses the following properties: Under arbitrary maintenance plan when jobs have common processing time, and different due dates, the optimal production schedule is to order the jobs by earliest due date first rule; and when jobs have common due date and different processing times, the optimal production schedule is shortest processing time first. The optimal maintenance plan is of control limit type under any arbitrary production schedule when machine is exposed under a cumulative damage failure process. Numerical studies on the optimal maintenance control limit of the maintenance plan indicate that as the number of jobs to be scheduled increases, the effect of jobs’ due dates on the optimal maintenance control limit diminishes.