Article ID: | iaor20082328 |
Country: | Netherlands |
Volume: | 107 |
Issue: | 1 |
Start Page Number: | 104 |
End Page Number: | 114 |
Publication Date: | Jan 2007 |
Journal: | International Journal of Production Economics |
Authors: | Yang Taho, Fu Hsin-Pin, Yang Kuang-Yi |
Keywords: | production: JIT, simulation: applications |
This research addressed an evolutionary-simulation optimization approach in solving a multi-constant work-in-process (multi-CONWIP) pull strategy problem. A case study is adopted to illustrate the performance of the applied methodology. Both the single-loop CONWIP and the just-in-time (JIT) control strategies are a special case of the proposed multi-CONWIP strategy. Empirical results showed that the proposed multi-CONWIP strategy outperformed the single-loop CONWIP and JIT for the case study problem. In general, the proposed methodology was effective and robust for the proposed problem. However, computational complexity existed for some instances; and these computational efficiency problems are addressed as potential future research opportunities.