The production planning for lot size manufacturing systems with earliness/tardiness due date in fuzzy environments

The production planning for lot size manufacturing systems with earliness/tardiness due date in fuzzy environments

0.00 Avg rating0 Votes
Article ID: iaor20081732
Country: China
Volume: 36
Issue: 5
Start Page Number: 65
End Page Number: 72
Publication Date: May 2006
Journal: Mathematics in Practice and Theory
Authors: , , ,
Keywords: production: JIT, heuristics: genetic algorithms
Abstract:

Production planning with fuzzy demands is described, and three types of fuzzy programming model are proposed. For solving these fuzzy models, fuzzy simulation and genetic algorithm are integrated to produce a hybrid intelligent algorithm, and a numerical example is given to illustrate its effectiveness.

Reviews

Required fields are marked *. Your email address will not be published.