Article ID: | iaor2008788 |
Country: | United States |
Volume: | 53 |
Issue: | 4 |
Start Page Number: | 646 |
End Page Number: | 661 |
Publication Date: | Jul 2005 |
Journal: | Operations Research |
Authors: | Murphy Frederic H., Smeers Yves |
Keywords: | game theory |
We consider three models of investments in generation capacity in restructured electricity systems that differ with respect to their underlying economic assumptions. The first model assumes a perfect, competitive equilibrium. It is very similar to the traditional capacity expansion models even if its economic interpretation is different. The second model (open-loop Cournot game) extends the Cournot model to include investments in new generation capacities. This model can be interpreted as describing investments in an oligopolistic market where capacity is simultaneously built and sold in long-term contracts when there is no spot market. The third model (closed-loop Cournot game) separates the investment and sales decision with investment in the first stage and sales in the second stage – that is, a spot market. This two-stage game corresponds to investments in merchant plants where the first-stage equilibrium problem is solved subject to equilibrium constraints. We show that despite some important differences, the open- and closed-loop games share many properties. One of the important results is that the prices and quantities produced in the closed-loop game, when the solution exists, fall between the prices and quantities in the open-loop game and the competitive equilibrium.