Article ID: | iaor19911985 |
Country: | Netherlands |
Volume: | 10 |
Issue: | 3 |
Start Page Number: | 159 |
End Page Number: | 163 |
Publication Date: | Apr 1991 |
Journal: | Operations Research Letters |
Authors: | Toczylowski Eugeniusz, Pienkosz Krzysztof |
The paper considers the aggregation of groups of similar items for a general multi-stage lot-size scheduling problem in the presence of nonzero initial stocks and variable safety stock levels. It is assumed that significant setups occur only when changing production from one family of similar items to another. An aggregated scheduling model is constructed, the optimal solution of which can be transformed into a