Shop floor control in a system job shop: Definitely not MRP

Shop floor control in a system job shop: Definitely not MRP

0.00 Avg rating0 Votes
Article ID: iaor19911932
Country: United States
Volume: 31
Start Page Number: 27
End Page Number: 32
Publication Date: Jan 1990
Journal: Production and Inventory Management Journal
Authors: , ,
Abstract:

MRP-type systems virtually cannot work for short-term shop floor control in complicated system manufacturing environments. The present analysis suggests what does work, which provides management a direction in which to improve their operations results: a ‘material availability’ approach which legitimizes the shortage list approach in a workable manner.