Master schedule/master production schedule: The same or different?

Master schedule/master production schedule: The same or different?

0.00 Avg rating0 Votes
Article ID: iaor19911926
Country: United States
Volume: 31
Start Page Number: 34
End Page Number: 38
Publication Date: Jan 1990
Journal: Production and Inventory Management Journal
Authors: ,
Abstract:

Better communication in, and education about, master production scheduling could result from assigning different meanings to these similar terms. This distinction offers a new approach to the ‘available to promise’ and ‘projected available’ concepts that makes them easier to grasp. ‘Projected on-hand’ rather than ‘projected available’ should be used to describe the projected end-of-period inventory.