A tool provisioning problem in an FMS

A tool provisioning problem in an FMS

0.00 Avg rating0 Votes
Article ID: iaor19911918
Country: Netherlands
Volume: 1
Start Page Number: 239
End Page Number: 254
Publication Date: Jan 1989
Journal: International Journal of Flexible Manufacturing Systems
Authors: ,
Keywords: production: FMS
Abstract:

A fundamental decision in designing a flexible manufacturing system (FMS) is the number and types of tools (cutters) to provide for system operation. This tool provisioning decision becomes especially important when space and equipment must be provided for refurbishing and storing tools within the FMS. In this article, the authors describe in detail the tool provisioning problem for a particular application, discuss approaches to making the tool provisioning decision, and explain why analytic models for this problem may be difficult to develop.

Reviews

Required fields are marked *. Your email address will not be published.