Late work minimization in a small flexible manufacturing system

Late work minimization in a small flexible manufacturing system

0.00 Avg rating0 Votes
Article ID: iaor20072839
Country: Netherlands
Volume: 52
Issue: 2
Start Page Number: 210
End Page Number: 228
Publication Date: Mar 2007
Journal: Computers & Industrial Engineering
Authors:
Keywords: production: FMS, programming: branch and bound
Abstract:

The paper concerns a small flexible manufacturing system consisting of three CNC machines: a lathe machine, milling machine and measurement center and a single robot, located at the Poznań University of Technology. A short description of the production environment, which can be modeled as the extended job shop system with open shop sections within particular jobs, is followed by the proposition of a branch and bound method. It optimizes production plans within a single shift in order to minimize the late work, i.e. the amount of work executed after a given due date. Based on results of computational experiments, conclusions are formulated on the efficiency of the B&B algorithm and on the behavior of FMS under consideration.

Reviews

Required fields are marked *. Your email address will not be published.