Critical chain project scheduling for C-130 aircraft isochronal inspection

Critical chain project scheduling for C-130 aircraft isochronal inspection

0.00 Avg rating0 Votes
Article ID: iaor20072459
Country: United States
Volume: 10
Issue: 2
Start Page Number: 39
End Page Number: 50
Publication Date: Jun 2005
Journal: Military Operations Research
Authors: ,
Keywords: inspection, project management
Abstract:

The major contribution of this article is a demonstration of a modified Program Evaluation and Review Technique algorithm developed by Dr. Eliyahu Goldratt called the ‘Critical Chain’ (CC) method of project scheduling. The CC rules were applied to a C-130 Isochronal Inspection process, in order to assess the advantages and/or appropriateness of the method. The research found that while improved performance in project durations was not demonstrated directly, the CC algorithm provides for improved overall project duration estimates. The improvement in duration estimates can be useful to mission schedulers, who rely on accurate estimations to assign resources to missions.

Reviews

Required fields are marked *. Your email address will not be published.