Erratum to: ‘Lot size effects on process lead time, lead time demand, and safety stock’

Erratum to: ‘Lot size effects on process lead time, lead time demand, and safety stock’

0.00 Avg rating0 Votes
Article ID: iaor20071148
Country: Netherlands
Volume: 103
Issue: 2
Start Page Number: 896
End Page Number: 896
Publication Date: Jan 2006
Journal: International Journal of Production Economics
Authors:
Keywords: inventory
Abstract:

Two typographical errors have been noted in this paper: Lot size effects on process lead time, lead time demand, and safety stock, International Journal of Production Economics, Volume 100, Issue 1, March 2006, Pages 1–9 by Timothy S. Vaughan.

Reviews

Required fields are marked *. Your email address will not be published.